Lesner Bridge Replacement
Project: Lesner Bridge Replacement
Description: This project replaced the existing Lesner Bridge with a signature facility that is capable of handling six lanes of traffic in the future. Due to existing bridge and power lines HRC 500 Series couplers were used to connect the 100 foot drilled shaft cages. The HRC 670 HeadLock was also used to fix elevation issues where hooks were installed to high.
Product: HRC 500 Series couplers and HRC 670 HeadLock.