Gerald Desmond Bridge
Project: Gerald Desmond Bridge Replacement
Description: The replacement bridge will be a six-lane, cable-stayed design, with a 205-foot clearance to allow the newest generation of cargo ships to enter the Port. Each segment of the bridge towers and drilled shaft cages used HRC 500 Series Couplers for the connection.
Product: HRC 500 Series Couplers and HRC 555 T-heads.